ABS Water Co-Operative

ABS Water Co-Operative

The ABS Water Co‐Operative relocated their base of operations from Camp Point, IL to Clayton, IL to provide improved customer service and consolidation of its maintenance and operations center to one convenient location. MECO led the design team, with architectural services provided by Hannibal architect Michael P. Kettelkamp.

The attractive steel, pre‐engineered ADA accessible building has a brick façade and metal standing‐seam roof, and high‐efficiency HVAC system and lighting. Landscaping, concrete parking lots and drives completed the project. The office interior includes an entrance foyer, the customer service area, administrative offices, restrooms, and a conference room for meetings and events.

The maintenance portion of the building includes vehicle maintenance bay and equipment, restrooms, and storage area for meters, pumps, and various supplies required for the daily operations of the Co‐Operative’s water system. The cost to construct the 3,927 square foot building was $495,000 and was constructed by Schlipman Construction, Inc. of Quincy, IL.

abs-water-co-operative-testimonial

loading