Installing silt fence
Erosion control fabric employed throughout project |
|
|
|
One of two new 10" finished water mains
Trenching in PVC pipe near IDOT maintenance facility. |
|
|
|
Jack and Bore
Boring under IL Hwy 106/ US Hwy 54 |
|
|
|
Bore Pit
|
|
|
|
|
Another bore pit and shoring
Near new Water Treatment Plant |
|
|
|
Two finished water mains
|
|
|
|
Excavating for water main.
|
|
|
|
New manhole
New gravity sewer will connect to the water treatment plant. |
|
|
|
Working at Water Treatment Plant site.
|
|
|
|
|
Concrete work on new clearwell.
|
|
|
|
Clearwell
|
|
|
|
Reinforcing steel for Clearwell top.
|
|
|
|
Pouring clearwell top.
|
|
|
|
Raw water main construction.
|
|
|
|
|
Raw water main construction activity.
|
|
|
|
Raw water piping.
Waiting for installation. |
|
|
|
Fused PVC
Fusion tents for pipe welder. |
|
|
|
Directional drilling.
|
|
|
|
Installing bored pipe.
|
|
|
|
|
Raw water main.
|
|
|
|
Connecting to bore.
|
|
|
|
Puller head.
Getting ready to pull directional bore pipe into place. |
|
|
|
Directional bore.
|
|
|
|
Backfilling
Use of compaction equipment on backfill. |
|
|
|
|
Connecting to another bore.
|
|
|
|
Bore pit.
|
|
|
|
New 14" pipe.
|
|
|
|
Prepping pipe for insertion into casing.
|
|
|
|
Pipe insertion.
|
|
|
|
|
Pipe installation.
|
|
|
|
Fire hydrant.
|
|
|
|
Fused pipe.
|
|
|
|
Pipe fusion by UGSI.
|
|
|
|
Excavator at sunset.
|
|
|
|
|
Road bore.
|
|
|
|
Fused pipe.
|
|
|